For contractors

Every sub's COI, W-9 and license before they start work

The drywall crew is on site Monday and you still don't have their certificate of insurance, their W-9 is the one from two companies ago, and the subcontract is unsigned. Tangentflow sends every sub on a job one private link for the COI, workers' comp, W-9, trade license and signed agreement. A certificate that expired in September is caught the moment it uploads, and an AI agent keeps asking until the paperwork is in, so you aren't the one calling their insurance agent.

Free to try with one client, no credit card. Pro is $29 a month for unlimited requests.

Sub paperwork, on autopilot

One batch per job. Paperwork in before anyone sets foot on site.

  1. 01 · When the bid is accepted

    Every sub on the job gets the same list, with your forms attached

    Start from the Subcontractor paperwork template and upload a sheet of your subs with the start date in a Needed by column. Each sub gets their own link, and the invitation carries a blank W-9 and your subcontract as forms to fill in and sign.

  2. 02 · Before mobilization

    Subs send what their agent sent them

    The COI arrives as the PDF the insurance agent emailed, a photo of the license card is fine, and the W-9 is filled in and signed on the phone. A sub can pass the link to their agent to upload the certificate directly.

  3. 03 · On every certificate

    Expired on arrival is caught on arrival

    The policy period on the certificate is compared with today. A W-9 that comes back blank, a subcontract with no signature, or a general liability certificate uploaded for the workers' comp item gets one sentence back to the sub saying what to redo.

  4. 04 · Until the start date

    Reminders run up to the start date, then stop

    The agent spaces reminders toward each sub's start date, listing only what they still owe. "What limits do you need?" is answered from the note you leave it. "Can we start Monday and send the COI Tuesday?" is handed to you.

  5. 05 · Day one on site

    A folder per sub for the job file, and the W-9s you'll need in January

    Download a ZIP per sub or send each to Google Drive. Keep the W-9s in your own system: 1099-NECs are due to subs and the IRS by January 31, and copies here are deleted after the request completes.

Maple St. remodel

8 subs · start Nov 3

Autopilot on

5

cleared to start

2

paperwork pending

1

expired

  • Delgado Electric

    COI, W-9, license, subcontract in

    Complete
  • Summit Roofing

    W-9 missing · reminder Wed

    Collecting
  • Clearline Plumbing

    COI expired Sep 30

    Needs a fix
  • Pro Drywall Co.

    Opened the link from the truck

    Not started
  • Hart HVAC

    All 5 items in

    Complete

Checked on arrival

Certificates and forms checked before the truck pulls up

The Subcontractor paperwork template describes each document the way your contract does. The expiration on a COI, the signature on a subcontract and the fields on a W-9 are checked as the sub uploads, so a lapsed policy is found on day one and not after an incident.

Certificate of liability insurance

  • Policy period covers the start date
  • Your company named as certificate holder
  • Insured name matches the sub

Workers' compensation

  • Current certificate
  • Or a written note from a sub with no employees

Form W-9

  • Blank IRS form attached for them
  • Filled in, not blank
  • Signed

Trade license

  • Valid on the start date
  • Optional for trades that aren't licensed in your state

Subcontract agreement

  • Your PDF, signed on the phone
  • Every page

Foreman and emergency contact

  • Foreman's name, cell and email as questions
  • Filled in by the agent from a reply

The agent chases paperwork so you can run the job

It emails each sub their list, answers "what limits?" and "can my agent send it?" from the notes you give it, and spaces reminders toward the start date, naming only what is still missing. Subs reply with the certificate attached and it is filed under the COI item. A sub who asks to start before the paperwork is in, or wants a different scope, is handed to you; the agent never agrees to anything on your behalf.

How it compares

Most remodelers and small GCs track sub paperwork in email and a spreadsheet, or pay for a compliance platform built for general contractors with hundreds of vendors. Tangentflow does one job: the paperwork in before the start date.

TangentflowEmail and a spreadsheetCOI tracking platforms
Sub creates an accountNo, a private link per subNoVendor portal sign-up
Expired COI noticedAs it uploadsWhen you read the datesYes, with renewal tracking
W-9 and subcontractAttached, filled in and signed on the phoneAttached, printed, scannedDepends on the platform
Chasing subsAgent, toward each sub's start dateYou callAutomated vendor emails
Every sub on a job at onceYes, from a sheet (Pro)One email at a timeYes
Getting startedMinutes, from the Subcontractor templateNothing to installWeeks
CostFree for one sub at a time, $29 a month on ProFreePer project or per vendor

Tracking renewals across hundreds of vendors all year is a compliance platform's job. Tangentflow collects the paperwork for each job. More on how it works for contractors.

Your numbers

What chasing costs you

Count the emails, the "just checking in" follow-ups and the second requests for the page that was missing. Move the sliders to your business.

Time spent chasing

7.5 h

Worth of your time

$450

Pro is $29 a month. If the agent takes even a quarter of that off your plate, that's $113 of your time back.

What you get

  • The Subcontractor paperwork template: COI, workers' comp, W-9, license, subcontract, contacts
  • A blank W-9 and your subcontract attached for subs to fill in and sign on their phone
  • Policy period and signature checks on every certificate and form
  • One batch per job with a start date per sub (Pro)
  • An agent that answers "what limits?" from your notes and chases to the start date
  • Subs or their insurance agents upload on the same link; subs reply by email too (Pro)
  • ZIP per sub, or delivery to Google Drive (Pro)

What it doesn't do

  • It doesn't verify coverage with the carrier or read endorsements for you; additional insured wording is yours to confirm
  • It doesn't track certificate renewals after a request completes; a new job means a new request
  • It doesn't file 1099-NECs; it gets the W-9s in so your bookkeeper can
  • Subs are reminded by email, not text

Questions contractors ask

Do my subs need to make an account?
No. Each sub gets one private link that opens in the phone browser, with the W-9 and subcontract attached to the email. Most subs finish from the truck. There is nothing to install and no login to forget between jobs.
Can I send the paperwork request to every sub on a job at once?
Yes, on Pro. Upload a sheet of up to 100 subs with a Needed by column for each start date, and each sub gets their own request and link. Subs with an open request from the same checklist are skipped so nobody is asked twice.
Does it check that the COI is current and names us?
It checks that the document is a certificate of insurance and that the policy period hasn't ended. Describe the item as "certificate of liability insurance naming [your company] as certificate holder" and the check looks for that too. It doesn't confirm coverage with the carrier, so read limits and additional insured endorsements yourself.
How do subs sign the subcontract and the W-9?
Attach each as a form to fill in. The IRS W-9 and most subcontracts are fillable PDFs, so the sub fills them in on the page, draws a signature, and the completed PDF is added to the item and checked for a signature. It is a simple electronic signature with no separate audit certificate.
Can their insurance agent send the certificate?
Yes, two ways. The sub passes their private link to the agent, who uploads the certificate directly. Or on Pro the sub forwards the agent's email from their own address as a reply to the request. Replies from the agent's address are bounced, since only the sub's address on file is accepted.
How long is the paperwork kept?
Up to 7 days on Free and 60 on Pro, or less if you set it on the checklist. Download the ZIP or let it deliver to Google Drive before the request completes. W-9s belong in your accounting system for 1099 season; Tangentflow isn't an archive.
What does it cost for a small crew?
Free is one open request at a time, with the agent on your first one, enough to run one sub through it. Pro is $29 a month for unlimited requests, the per-job batch, email replies with attachments and Drive delivery.

two minutes to set up, nothing for your clients to install

Send the next request and stop chasing it.

The first request is free with the full agent. No card, and your clients never make an account.

© 2026 Tangentflow

Collect → Process → Complete → Forget